Company news

Latest bid information

BJCEEE Won the Bid of CDQ Waste Heat Power Generation Work, an Upgraded Project for 4.3m Coke Oven for Henan Liyuan New Energy Technology Co., Ltd.


On 5th June, 2020, BJCEEE won the bid of CDQ waste heat power generation work, an upgraded project for 4.3m coke oven for Henan Liyuan New Energy Technology Co., Ltd., and the capacity of the CDQ is 190t/h with a high temperature and high pressure natural circulation boiler. This project is equipped for 2×60×6.25m stamp-charging coke oven, and it is an EPC project except power generation.

Beijing JC Energy & Environment Engineering Co., Ltd.(BJCEEE)
All rights reserved Beijing ICP Certificate No. 10219042
Copyright © 2010 All Rights Reserved Address: 13F, China Railway Construction Plaza, 20 Shijingshan Road, Shijingshan District Beijing 100040, P.R.CHINA
Tel: 010-88680646、88680647
Fax: 010-88682330