Company news
Implement the "Dual Carbon" Goals by Using Standards as a Driving Force
The year of 2025 marks a critical milestone, coinciding with the conclusion of the 14th Five-Year Plan and the deeper advancement of the “Dual Carbon” goals. At this pivotal time, our company, serving as a core drafting unit, developed the group standard "Design Code for High-Parameter Coke Dry Quenching Waste Heat Power Generation"(T/CIECCPA085-2025), which was officially implemented on July 30, 2025. This standard embodies over two decades of our technical expertise in the field of coking energy conservation.
This standard specifies the technical requirements, manufacturing, installation and instruction manual, testing and acceptance procedures, inspection and verification protocols, operational parameters, environmental protection measures, as well as safety and occupational health standards for high-parameter CDQ waste heat power generation technology. It applies to new, expanded, or upgraded CDQ waste heat power generation projects, which utilize high-temperature flue gas from CDQ as heat source, with initial steam parameters ranging from 9.8 MPa to 17.5 MPa in pressure and 540°C to 571°C in temperature, and intermediate reheat.
The preparation of the Standard signifies that our company's technical capabilities in the field of sustainable development have been recognized by industry associations, highlighting our innovation philosophy of "Building the Enterprise through Technology, Setting Standards as a Pioneer." Taking the preparation of the Standard as an opportunity, our company will continue to deliver innovative technologies in the future and collaborate with partners across the industrial chain to build a green standard ecosystem.