Company news
110t/h CDQ of Energy-Saving Reform Project for No.3 & No. 4 Coke Oven of Shandong Jinneng Science & Technology Co., Ltd. Putting into Operation
110t/h CDQ plant associated with NO.3 and No.4 Coke Oven for Jinneng Science & Technology Co., Ltd., located in Qihe county, Dezhou city in Shandong province, was successfully put into operation on the morning of November 28, 2014.
With the strong supports and close cooperation from two parent companies (Beijing Shougang International Engineering Technology Co., Ltd. in charge of detailed engineering and Nippon Steel & Sumikin Engineering Co., Ltd. responsible for overall technology, basic design), Beijing JC Energy & Environment Engineering Co., Ltd. (BE3) has completed the general contracting management of the project, including engineering, procurements and construction for the system of CDQ.
The contract of 110t/h CDQ plant associated with No.3 & No.4 Coke Oven for Jinneng Science & Technology Co., Ltd. was signed on September 29, 2013, the project commenced on January 13, 2014 and took ten and half months for putting into operation, which was highly appreciated by the owner and made great contribution to energy conservation and emission reduction in the area of Dezhou city.
Herein, we BE3 extend our heartfelt thanks to the staffs from all levels of Jinneng Science & Technology Co., Ltd. for their strong assistances and supports during the period of construction progress and quality assurance.
Beijing JC Energy & Environment Engineering Co., Ltd. (BE3) adheres all the way to the enterprise culture of “ Achievements in Quality for Customers; Achievements in Ideals for Staff; Achievement in the Blue Sky for the Earth”, performs well the design, constructions and managements for the customer, advocates the saving energy and protecting environment and practices recycling economy.