Newsletter of productions for CDQ project with the capacity of 125t./h.
in Xingtai Iron & Steel Corp. Ltd.
The CDQ project with the capacity of 125t/h. for Xingtai Iron & Steel Corp. Ltd., generally contracted by Beijing JC Energy & Environment Engineering Corp. Ltd., has already been charged with red coke on July 8, 2011. The rated treatment capacity for the project is 125t/h. while actual capacity is 107t/h. The steam produced by CDQ plants is 71.3t/h. (max.), and 61.4t/h (actual); the pressure is 9.5MPa (pressure after regulating valve at the outlet of boiler), and the temperature is 540℃. All steam is used for generating electricity, with annual capacity of 132.48x106kWh.
Beijing JC Energy & Environment Engineering Co., Ltd., depending on professional management of project and strong technical supports from Nippon Steel Engineering Co., Ltd. Japan, as well as taking the conceptions of high efficiency, energy saving and environmental protection, by scientific organizations and careful construction, guarantees the successful productions of CDQ plants in Xingtai Iron & Steel Corp. Ltd. on time and with high quality.